
Otumara Flow Station
Gas lift Compression Lease Facility At Otumara Flow Station.
- Otumara Field is located in OML 43 about 65 km NW of Warri. The intention of the contract is to enable provision of Gas lift to sustain / increase production from Otumara Wells.
- BOO (Build Own & Operate) Contract, Lease, and Operation & Maintenance of plant during the contract term (2002 till date) with no registered LTA.
- Contract Scope covers Design, Procurement, Supply, Fabrication, Inspection, Testing & Supervision during installation of a 20mmscfd Gas-lift Compression package